We are Certified Engineer

OurProjects

Our recent projects
Umm Al Dome (Petroserv-Strukton JV)
We installed the traffic signage and road marking for the
completion of main upgrading works on Umm Al Dome,
Al-Muaither, and Al Innabi Streets and their opening to
traffic, as part of Umm Al Dome Street Improvement
Project in Muaither area.
Interchange IC3 (Redco-Porr JV)
HNH created a contraflow configuration at G-Ring Road
to enable the construction works for the new Interchange
IC3 at Ras Bu Fontas Free Zone, Southwest of Hamad
International Airport (HIA).
Red Line North (RLR JV)
HNH assisted in completing the Red Line Metro project
on time for the last 5 years. RLR JV and HNH achieved
Over a major safety milestone in the traffic management
industry, having completed over 1 million hours of
temporary traffic management without lost time due to
injury
Lusail LRT (QDVC)
Operations and maintenance of the work zones for Lusail
LRT And The Lusail LRT is a light rail network as part of the Lusail
urban development.
Framework Contract (Infraroad)
HNH installed the traffic signs and road markings for the
Inner Doha and Outer Doha Framework Contracts.
New Orbital Highway (J&P)
Traffic Management Services for Al Majd Road (New
Orbital Highway), the longest highway in Qatar, running
at a length of 195 km.
Bridge Inspections (WSP)
Traffic Management services for infrastructure inspection
on bridges along Doha.
Electric Vehicle Parking (Infraroad)
Electric Vehicle Parking.
Client: Kahramaa.
Description: Electric Vehicle Charging Point marking for
Kahramaa (Water & Electricity) at Abu Hamour, Doha
(Qatar)
Al Khor Expressway (Tekfen)
Design and Implementation of Traffic Diversion Plans for
Al Khor Expressway, a new 10 lane highway with 10
intersections, as well as a number of viaducts,
overpasses and underpasses
New Orbital Highway (QDVC-Bin Omran JV)
The New Orbital Highway Contract 2 (NOH2) stemmed
from the intention to bypass Doha City by connecting
Salwa Road and North Relief Road. NOH2 consists of 10
lanes (5 in each direction) for light vehicles with
additional Collectors and Distributor roads. Four separate
dedicated truck lanes (2 in each direction) run parallel to
the Orbital from Salwa Road to Junction 5 where a 320m
long cut and cover tunnel splits away from the light
vehicle carriageway towards Junction 12 Dukhan
interchange
West Corridor (J&P)
Bike lane near East-West Corridor, which will connect all
8 stadiums built for the Qatar 2022 FIFA World Cup, as
well as fan zones, residential areas, markets, tourist sites
and Hamad International Airport.
Falcon Air Base (UCE)
Road Marking works at the air base for all the Falcon-3
Facilities and infrastructure in Doha.
Qatar Armed Forces (Topgrade)
Helipad marking for Qatar Armed Forces
Our Clients